top of page
1/4
P-440 Pier 8 Replacement Naval Base San Diego, CA
San Diego, CA
PROJECT FEATURES
- • Design-build
• Demolition
• Reinforced concrete pier construction
• Pile driving – 24-in. concrete octagonal piles
AWARDS
- 2022 | AGC of America | Construction Risk Partners Build America: Marvin M Black Partnering Excellence Merit Award
2022 | AGC of America | Construction Risk Partners Build America Award for Federal & Heavy New
2022 | International Partnering Institute | John L. Martin Partnered Project of the Year Sapphire Award
2022 | Construction Management Assoc. of America | Project Achievement Award for Government Contracts Greater Than $50M
2021 | AGC of California | Constructor Award for Excellence in Partnering
2021 | AGC of San Diego | Build San Diego Merit Award for Unique Special Project
PROJECT PURPOSE
This project replaced the existing Pier 8 at Naval Base San Diego with a new, larger, concrete pier. The new pier is 117 ft. by 1,600 ft. and is capable of supporting a 181-metric ton crane.